Menu

Sleep Center at Hoag Health Center

The Sleep Center comprises a portion of the second floor within an existing two-story building. The facility consists of offices, exam rooms, sleep rooms and other miscellaneous support spaces. tk1sc was hired to perform commissioning services to meet the requirements for fundamental commissioning under the LEED rating system. The air handling unit is equipped with economizer controls that takes advantage of free cooling during optimal outdoor temperatures. The building automation system incorporates several energy saving strategies such as equipment duct static pressure reset, discharge temperature setback. Dedicated domestic hot water pumps have been installed along with aqua stats to maintain a constant loop temperature within the space while limiting the pump use. Automatic day light dimming controls are installed throughout for all perimeter spaces in order to take advantage of natural day light whenever possible.

Commissioned systems included:

  • Air Conditioning (Air Handling Units, CAV Boxes, Return Fans)
  • Ventilation (Exhaust Fans)
  • Lighting Control Systems (Occupancy Sensors, Daylighting, Dimming, Light Control Panel)
  • Domestic Hot Water System
  • Energy Management System

Project Details

Location: Newport Beach, CA
Square Feet: 9,100 Square Feet
Type: LEED Silver Certified
View Website

Related Projects