Airborne Systems Tenant Improvements
Santa Ana, CA
Home
/
Projects
/
Airborne Systems Tenant Improvements
PROJECT LEADER
Michael Matonic
COMPLETION DATE
CLIENT
H. Hendy Associates
PROJECT TYPE
Corporate

Airborne Systems is a world leader in military parachute design, manufacturing, and training. They tasked tk1sc with providing full-service MEP engineering and commissioning services for their new office, warehouse, and manufacturing space. Located in Santa Ana's Alere's Orange County Industrial Center. This 159,163 Square Foot space provides Airborne System enough space to operate. The intention for this space design was to create a better connection between the front office and the manufacturing floor that blurs the lines between the two functions. This space's open ceiling concepts allowed us to show off our design work while adding to the overall rugged and industrial feel of this space.

PROJECT TEAM:
Ron Zawadzki
Charles Hutchinson
Eileen Thomas
Michael Matonic
Images Courtesy of
Previous Image Button
Next Image Button
No items found.
PROJECT LEADER
Michael Matonic
COMPLETION DATE
CLIENT
H. Hendy Associates
PROJECT TYPE
Corporate

Airborne Systems is a world leader in military parachute design, manufacturing, and training. They tasked tk1sc with providing full-service MEP engineering and commissioning services for their new office, warehouse, and manufacturing space. Located in Santa Ana's Alere's Orange County Industrial Center. This 159,163 Square Foot space provides Airborne System enough space to operate. The intention for this space design was to create a better connection between the front office and the manufacturing floor that blurs the lines between the two functions. This space's open ceiling concepts allowed us to show off our design work while adding to the overall rugged and industrial feel of this space.

Images Courtesy of
Previous Image Button
Next Image Button
No items found.
Airborne Systems Tenant Improvements
Santa Ana, CA
Home
/
Projects
/
Airborne Systems Tenant Improvements
PROJECT LEADER
Michael Matonic
COMPLETION DATE
CLIENT
H. Hendy Associates
PROJECT TYPE
Corporate

Airborne Systems is a world leader in military parachute design, manufacturing, and training. They tasked tk1sc with providing full-service MEP engineering and commissioning services for their new office, warehouse, and manufacturing space. Located in Santa Ana's Alere's Orange County Industrial Center. This 159,163 Square Foot space provides Airborne System enough space to operate. The intention for this space design was to create a better connection between the front office and the manufacturing floor that blurs the lines between the two functions. This space's open ceiling concepts allowed us to show off our design work while adding to the overall rugged and industrial feel of this space.

PROJECT TEAM:
Ron Zawadzki
Charles Hutchinson
Eileen Thomas
Michael Matonic
tk1sc Project

Airborne Systems Tenant Improvements

Client

H. Hendy Associates
Location
Santa Ana, CA

Airborne Systems is a world leader in military parachute design, manufacturing, and training. They tasked tk1sc with providing full-service MEP engineering and commissioning services for their new office, warehouse, and manufacturing space. Located in Santa Ana's Alere's Orange County Industrial Center. This 159,163 Square Foot space provides Airborne System enough space to operate. The intention for this space design was to create a better connection between the front office and the manufacturing floor that blurs the lines between the two functions. This space's open ceiling concepts allowed us to show off our design work while adding to the overall rugged and industrial feel of this space.

Our Services

What we did.

Walkthrough Video

Heading

This is some text inside of a div block.
Newport Beach, CA

Hoag Hospital - Heart Vascular Institute

Healthcare
Duarte, CA

City of Hope - Administrative Building

Healthcare
La Jolla, CA

The Scripps Research Institute - Stein Library

Civic