This tenant improvement for Dowler Gruman Architects is located on 2550 Fifth Avenue in San Diego, California. The project is an 8,000 square foot office space that includes an open floor concept with multiple breakout and meeting rooms. The exposed ductwork and decorative lighting can be seen throughout the building.

Mechanical Solution: Some of the challenges with this tenant improvement included retrofitting an existing system to properly control the tenant's space and upgrading the current HVAC system design to allow for proper return airflow and economization. This required coordination with multiple tenants outside our immediate tenant improvement. These challenges included coordinating with the adjacent tenant, a bank, to assure we had appropriate paths for returning air plenum while maintaining their space's security. We also had to design a stand-alone relief air system as the existing air handler could not economize properly. Perhaps the greatest challenge of this project was the investigative work upon completion to unearth why the current shell system was not operating per design. This required multiple meetings with facilities, a review of trend data, and detailed site walks; however, a comprehensive plan was able to be developed to identify the existing infrastructure problems and repair them to provide a comfortable space for the tenant.

 

Electrical Solution: This office tenant improvement required complex lighting solutions to coordinate with the unique open ceiling elements that consisted of a concrete waffle design while maintaining compliance with Title 24 energy codes. Specialty design elements include acoustical fixtures selected to combat noise commonplace in an open office setting and combine commercial lighting fixtures with decorative elements to create a firm representative that occupied the space.

 

Plumbing Solution: The unique challenge from a plumbing standpoint was to find aesthetically pleasing breakroom fixtures that represented the architecture firm's vision. This was accomplished by finding fixtures with clean, sleek lines that gave a specialty fixture's outward appearance that still met Title 24 and CalGreen flow rates.

PROJECT TEAM:
Joe Ross
Ray Swartz
Becky Clift
Images Courtesy of
David Cox
Previous Image Button
Next Image Button
No items found.
PROJECT LEADER
COMPLETION DATE
February 1, 2017
CLIENT
DGA
PROJECT TYPE
Commercial Office

This tenant improvement for Dowler Gruman Architects is located on 2550 Fifth Avenue in San Diego, California. The project is an 8,000 square foot office space that includes an open floor concept with multiple breakout and meeting rooms. The exposed ductwork and decorative lighting can be seen throughout the building.

Mechanical Solution: Some of the challenges with this tenant improvement included retrofitting an existing system to properly control the tenant's space and upgrading the current HVAC system design to allow for proper return airflow and economization. This required coordination with multiple tenants outside our immediate tenant improvement. These challenges included coordinating with the adjacent tenant, a bank, to assure we had appropriate paths for returning air plenum while maintaining their space's security. We also had to design a stand-alone relief air system as the existing air handler could not economize properly. Perhaps the greatest challenge of this project was the investigative work upon completion to unearth why the current shell system was not operating per design. This required multiple meetings with facilities, a review of trend data, and detailed site walks; however, a comprehensive plan was able to be developed to identify the existing infrastructure problems and repair them to provide a comfortable space for the tenant.

 

Electrical Solution: This office tenant improvement required complex lighting solutions to coordinate with the unique open ceiling elements that consisted of a concrete waffle design while maintaining compliance with Title 24 energy codes. Specialty design elements include acoustical fixtures selected to combat noise commonplace in an open office setting and combine commercial lighting fixtures with decorative elements to create a firm representative that occupied the space.

 

Plumbing Solution: The unique challenge from a plumbing standpoint was to find aesthetically pleasing breakroom fixtures that represented the architecture firm's vision. This was accomplished by finding fixtures with clean, sleek lines that gave a specialty fixture's outward appearance that still met Title 24 and CalGreen flow rates.

Images Courtesy of
David Cox
Previous Image Button
Next Image Button
No items found.
DGA San Diego
San Diego, CA
Home
/
Projects
/
DGA San Diego
PROJECT LEADER
COMPLETION DATE
February 1, 2017
CLIENT
DGA
PROJECT TYPE
Commercial Office

This tenant improvement for Dowler Gruman Architects is located on 2550 Fifth Avenue in San Diego, California. The project is an 8,000 square foot office space that includes an open floor concept with multiple breakout and meeting rooms. The exposed ductwork and decorative lighting can be seen throughout the building.

Mechanical Solution: Some of the challenges with this tenant improvement included retrofitting an existing system to properly control the tenant's space and upgrading the current HVAC system design to allow for proper return airflow and economization. This required coordination with multiple tenants outside our immediate tenant improvement. These challenges included coordinating with the adjacent tenant, a bank, to assure we had appropriate paths for returning air plenum while maintaining their space's security. We also had to design a stand-alone relief air system as the existing air handler could not economize properly. Perhaps the greatest challenge of this project was the investigative work upon completion to unearth why the current shell system was not operating per design. This required multiple meetings with facilities, a review of trend data, and detailed site walks; however, a comprehensive plan was able to be developed to identify the existing infrastructure problems and repair them to provide a comfortable space for the tenant.

 

Electrical Solution: This office tenant improvement required complex lighting solutions to coordinate with the unique open ceiling elements that consisted of a concrete waffle design while maintaining compliance with Title 24 energy codes. Specialty design elements include acoustical fixtures selected to combat noise commonplace in an open office setting and combine commercial lighting fixtures with decorative elements to create a firm representative that occupied the space.

 

Plumbing Solution: The unique challenge from a plumbing standpoint was to find aesthetically pleasing breakroom fixtures that represented the architecture firm's vision. This was accomplished by finding fixtures with clean, sleek lines that gave a specialty fixture's outward appearance that still met Title 24 and CalGreen flow rates.

PROJECT TEAM:
Joe Ross
Ray Swartz
Becky Clift
tk1sc Project

DGA San Diego

Client

DGA
Location
San Diego, CA

This tenant improvement for Dowler Gruman Architects is located on 2550 Fifth Avenue in San Diego, California. The project is an 8,000 square foot office space that includes an open floor concept with multiple breakout and meeting rooms. The exposed ductwork and decorative lighting can be seen throughout the building.

Mechanical Solution: Some of the challenges with this tenant improvement included retrofitting an existing system to properly control the tenant's space and upgrading the current HVAC system design to allow for proper return airflow and economization. This required coordination with multiple tenants outside our immediate tenant improvement. These challenges included coordinating with the adjacent tenant, a bank, to assure we had appropriate paths for returning air plenum while maintaining their space's security. We also had to design a stand-alone relief air system as the existing air handler could not economize properly. Perhaps the greatest challenge of this project was the investigative work upon completion to unearth why the current shell system was not operating per design. This required multiple meetings with facilities, a review of trend data, and detailed site walks; however, a comprehensive plan was able to be developed to identify the existing infrastructure problems and repair them to provide a comfortable space for the tenant.

 

Electrical Solution: This office tenant improvement required complex lighting solutions to coordinate with the unique open ceiling elements that consisted of a concrete waffle design while maintaining compliance with Title 24 energy codes. Specialty design elements include acoustical fixtures selected to combat noise commonplace in an open office setting and combine commercial lighting fixtures with decorative elements to create a firm representative that occupied the space.

 

Plumbing Solution: The unique challenge from a plumbing standpoint was to find aesthetically pleasing breakroom fixtures that represented the architecture firm's vision. This was accomplished by finding fixtures with clean, sleek lines that gave a specialty fixture's outward appearance that still met Title 24 and CalGreen flow rates.

Our Services

What we did.

Walkthrough Video

Heading

This is some text inside of a div block.
Thousand Oaks, CA

Fred Kavli Theatre

Arts + Exhibits
Irvine, CA

Taylor Irvine Headquarters

Commercial Office
Claremont, CA

Pitzer College Housing

Higher Education